EU TRANSMISSION & DISTRIBUTIONREV 2026-08-16

Grid capacity atlas

Support ☕
Where a datacenter can connect — demand headroom per node.
Electricity Explorer
Loading Europe demand-headroom overview…
Filter MW:

Layers by country

Read honestly: 0 MW = saturated (full — not missing data) · values are indicative & non-additive between nearby nodes (never sum them) · per-line real-time flow is not published.

Data — grid capacity: REE/CNMC, NESO, RTE, Terna, BNetzA, PSE, Svenska kraftnät, Statnett, Fingrid, E-REDES. Lines: OpenStreetMap (ODbL). Plants: REE ESIOS / RAIPRE. Cooling: WorldClim 2.1 (non-commercial). Water stress: WRI Aqueduct 4.0. GB curtailment: Elexon. Constraint boundaries: NESO ETYS.

Spain deep-dive ▸

Candidate sites — corridor finder

Legend — MW available

550100250500900+

Circle area ∝ MW; ring: 400 kV bright · lower kV grey. Points sit on the matched town/substation centre (indicative). Transmission carries ≥100 MW; distribution nodes cap ~60–140 MW.

About the data ▸